Congratulations to Affinity Energy on the award for Duke Energy’s Novo Project.
Duke Energy’s Premier Power selects Affinity Energy to design and install on-site generation SCADA system at Novo Nordisk in Clayton, NC. Affinity Energy will be integrating a Trihedral’s VTScada solution to monitor and control electrical equipment such as standby generators, uninterruptible power supplies and power distribution switchgear. “This is a very exciting project for Affinity Energy”, says Allan Evora, President. “Power management and control is one of our core competencies. We had to think outside of the box to address the project’s unique requirements. We also had to mobilize our team within a very short time frame”.
Equipment integrated include: Kohler generators, Caterpillar generators, Liebert NXL UPSs, Schweitzer Engineering Labs protective relays and meters, Woodward controllers and electrical switchgear. Duke Energy is the largest electric Utility in the United States. Novo Nordisk is a premier manufacturer of pharmaceutical products and services. Affinity Energy designs, integrates and installs power and energy SCADA systems.